Take a look at some pictures of the construction going on at OHT this 2009-2010 school year.

Ariel View Drive Lane
Parking Lot Landscape
B Hall is closed Part of the courtyard is closed
Location of new Lib/Admin wing Construction is underway
Preparing the ground Construction Image
Construction September Construction
Field Image Field Image
Construction Worker Tree Trunks
Portable Field
Clearing the area B Hall
Concrete Prep Concrete Prep
Concrete Prep B Hall
Concrete Prep Concrete Prep
Concrete Concrete
B Wing Dec. 18 View from parking lot
Dec 18 Dec. 18
B Hall January 2010 The first wall goes up!
The first wall Week of January 11th
Library Library
January Entrance
January Admin Wing
Old Meets New Admin Wing
Roof Admin Windows
worker puts up insulation old B hall
entrance entrance roof
worker Library
Library windows insulation for library
This was entrance to B hall Brick work
Brick goes up Library
A look inside Looking inside the entrance
Window Window up close
New Entrance Entrance Exterior
Exterior Admin wing exterior
Interior Library interior
Library Interior Men at work in the library
B wing connection Bathroom Tile
Interior Tile Work
Lighting Materials
Library mural back of library wall
library wall before library wall after
mural is supported before it's moved mural is removed
view from hall mural in new entrance
mural looks great with natural light Library Interior
Drywall goes up! Library interior