Garcia Middle School

Photos for Building Committee Meeting

for

September 2008

 


Ductwork.jpg


1st Floor Area 2 Interior CMU #1.jpg

1st Floor Area 2 Interior CMU.jpg

1st Floor Area 2 Plumbing Rough-in.jpg

2nd Floor Area 2 Steel.jpg

2nd Floor Area 3 Foundation.jpg


2nd Floor Area 3 Mechanical

Room Foundation.jpg


Acceleration Lane on

Kyle Seale Parkway.jpg


Area 1 South Low Roof.jpg


Area 4 CMU and

Spray-on Fireproofing.jpg


Area 5 Mezzanine.jpg

August 08 - IMG_7054.jpg

August 08 - IMG_7055.jpg

August 08 - IMG_7061.jpg

August 08 - IMG_7064.jpg

August 08 - IMG_7069.jpg

Chiller Pad Foundation Rough-in.jpg


Concrete Roof Structure at

Area 3 Locker Room Area.jpg


Ductwork in Band Hall in Area 5.jpg


Elevated Beams and Columns

at Locker Room Area in Area 3 #1.jpg


Elevated Concrete Beams Columns t 2nd Floor Area 2.jpg


Fireproofing in Area 5.jpg

Football Field.jpg


Footing for Retaining Wall at Tennis Courts.jpg


Forming Stairs XC103 in Area 2.jpg


High Roof Above

Band Hall Area at Area 5.jpg


Hydronic and Copper Overhead

Rough-in at Corridor XB101 in Area 5.jpg


IMG_0623.jpg

IMG_0624.jpg

IMG_0625.jpg

IMG_0626.jpg

IMG_0627.jpg

IMG_0628.jpg

IMG_0629.jpg

IMG_0630.jpg

IMG_0631.jpg

IMG_0632.jpg

IMG_0633.jpg

IMG_0634.jpg

IMG_0635.jpg

IMG_0636.jpg

IMG_0637.jpg

IMG_0638.jpg

IMG_0639.jpg

IMG_0640.jpg

IMG_0641.jpg

IMG_0642.jpg

IMG_0643.jpg

IMG_0644.jpg

IMG_0645.jpg

IMG_0646.jpg

IMG_0647.jpg

IMG_0648.jpg

IMG_0649.jpg

IMG_0650.jpg

IMG_0651.jpg

IMG_0652.jpg

IMG_0653.jpg

IMG_0654.jpg

IMG_0655.jpg

IMG_0656.jpg

IMG_0657.jpg

IMG_0738_1.jpg

IMG_0739_2.jpg

IMG_0740_3.jpg

IMG_0741_4.jpg

IMG_0742_5.jpg

IMG_0743_6.jpg

IMG_0744_7.jpg

IMG_0745_8.jpg

IMG_0746_9.jpg

IMG_0747_10.jpg

IMG_5205.jpg

IMG_5219.jpg

IMG_5229.jpg

IMG_5230.jpg

IMG_5237.jpg


Interior CMU at

Platform in Area 4.jpg


Interior CMU at Ramp in

Corridor XC102 in Area 2.jpg


Interior CMU in

Art B112 in Area 5.jpg


Irrigaiton at Softball Field.jpg


Mechanical Room C161 on

1st Floor of Area 2.jpg


Mid Level Beams at Gym.jpg


Mid Level Concrete Beams

and Columns at Gyms in Area 3 #1.jpg


Overhead Rough-in

Under Mezzanine in Area 5 #1.jpg


Roof Above

Art Rooms in Area 5.jpg


Roof Above Kitchen and

Cafeteria in Area 4.jpg


Roof Above Machine

Room in Area 5 #2.jpg


Roof Above Wood Shop

and Career Tech in Area 5.jpg


Roof Structure at Area 1.jpg

Sidewalk from Building to Football Field.jpg

Stair XA101 in Area 1.jpg

Storage Building Foundation.jpg

Water Main Upgrade Along Tall Heights.jpg

West Elevation of Area 5 #1.jpg

FACILITIES & OPERATIONS

5900 Evers Rd. San Antonio, TX. 78238 Tel.(210) 397-1200 Fax (210) 257-1212

Web Managers: Mario Castanares/Peter Cristan