Construction Management II M

Course: Construction Mgt II M   
1st Nine Weeks2nd  Nine Weeks3rd NineWeeks4th Nine Weeks

Unit(s):

Carpentry Mod 6

Unit(s): 

Carpentry Mod 7

Unit(s): 

Carpentry Mod 8

Unit(s): 

Carpentry Mod 9

General lab, Site and Tool Safety

 

Module 6: Wall Systems

Describe procedures for laying out wall systems, including windows, doors, partitions and corners. Types of corners, headers, partitions, material selections, estimating/take-off, and pricing. Structural integrity , load bearing and non load bearing and fire stops. (NCCER module Exam)

Module 7: Ceiling Joist and Roof Framing. Describe type of residential roofs and instruction on laying out rafters for gable, shed, and hip roofs systems. Cover stick framing and truss framing. Basic roof sheathing and  covering installations. (NCCER module Exam)

 

Fall CCA

Module 8: Introduction to Building Envelope Systems. Introduced to the concept of the building envelope and explains its components. Types of windows,skylights, exterior doors and installation procedures. Window and door flashing.

(NCCER module Exam)

Module 9: Basic Stair Layout

Introduces types of stairs and common building code requirements related to stairs. Focuses on techniques for measuring and calculating rise, run,and stairwell opening, laying out stringers and fabrication.

(NCCER module Exam)

 

Spring CCA

Required Project: 

Module 6: Layout, construct, and assemble wall systems, include, door,windows, partitions, solid or California corners.

Required Project: 

Module 7:

layout and install Rafters and ceiling systems. Construct a gable or shed roof system.

Required Project: 

 

Module 8: Prepare window and door opening for installations.Install windows and exterior doors. Install house wrap.

Install locksets

Required Project: 

 

Module 9: Construct a basic stairs system. Calculate the total rise, number and size of threads required for a stairs.Layout and cut stringers

Module 6:

• Structure loading of walls.

• Load Bearing and non-load bearing walls.

• Material estimate

• Material selections

• Determine studs heights.

• Lay out 16’’ and 24’’ O.C.

• Layout doors,windows, partitions assembly and corners

• Determine door and window headers, using span charts

• Assemble wall systems

• Square wall systems

• Erect exterior and interior walls, and plumb wall systems

• Blace wall systems and install double top plates and partition plates.

Finally students will take the (NCCER module Exam online).

Module 7: 

• Roof material estimate, selections and pricing.Frame tiny home roof systems. Install roof deck and protective membrane. Prep standing seam roof panels Install standing seam metal roofing.Finally students will take the (NCCER module Exam online).

Module 8: 

Prep window and door cavities. Flash window and door openings.Install windows and doors. Trim windows and doors.

• Finally students will take the (NCCER module Exam online).

Module 9:

•  Perform stairs calculations.

• Estimate stairs materials, sizing and pricing.

• Layout stairs.

• Construct and install a stairs system.

• Finally students will take the (NCCER module Exam online). 

 

Successful completion of all nine modules will ensure level one certification.

Employability Skills:   

Cycle 1:

-Professionalism

-Teamwork

-Problem Solving

127.15 (2)(A)

127.15 (2)(B)

127.15 (2)(C)

127.15 (2)(D)

127.15 (2)(E)

127.15 (2)(F)

127.15 (2)(G)

127.15 (2)(H)

127.15 (2)(I)

127.15 (2)(J)

127.15 (2)(L)

Cycle 2:

- Job Seeking Skills

127.15 (2)(A)

127.15 (2)(H)

127.15 (2)(I)

127.15 (2)(J)

127.15 (2)(K)

127.15 (2)(L)

Cycle 3:

-Communication Skills

-Self Management Skill

127.15 (2)(A)

127.15 (2)(B)

127.15 (2)(C)

127.15 (2)(D)

127.15 (2)(E)

127.15 (2)(F)

127.15 (2)(G)

127.15 (2)(H)

127.15 (2)(I)

127.15 (2)(J)

127.15 (2)(L)

Cycle 4:

-Civic and Social Responsibility

127.15 (2)(F)

127.15 (2)(G)

127.15 (2)(H)

127.15 (2)(I)

127.15 (2)(L)

CHOICES 360 Activities L4   
Transferable Skills Checklist OR Personal Values & Priorities OR 
School Finder After High School Transition Plan