| Course: Construction Technology I - 03/26/2026 | |||
| 1st Nine Weeks | 2nd Nine Weeks | 3rd Nine Weeks | 4th Nine Weeks |
Unit 1: Safety OSHA 10 Unit 2: Employability Unit 3: Concrete | Unit 4: Framing Systems: Floors, Walls, Ceilings | Unit 5: Roofing Unit 6: Electrical Wiring, | Unit 7: Building Materials/Drywall Unit 8: Building Materials, drywall(cont) Framing Stairs |
-Unit 1:Safety (6 weeks) -Students understand that safe working habits are imperative in the classroom and in the field. Review safety procedures, safety culture, -OSHA 10 course (Career Safe) -Unit 2: Employability (1 week) - Students demonstrate professional standards/employability skills as required by business and industry. -PPE, OSHA, SDS, HazCom, Identify / avoid hazards / risks Unit 3: Concrete (2 weeks) -Concrete ingredients -Concrete types -Types of aggregate -PSI and cylinder tests -Slump -Additives (accelerators, retarders) -Workability -Rebar -Types of forms -Types of footings -Label forms -Calculate cubic yards -Mixing techniques | Unit 3: cont. concrete (3 weeks) Unit 4: Framing Systems (6 weeks)
Floor Framing: (3 weeks) -Joist -Band board -Rim Joist -Joist hanger -Cross bracing -Solid Bracing -TJI Joists - Truss Joists -Glue lam beams -Engineered lumber
Wall Framing:(3 weeks)
-Identify wall members -16”, 24” OC framing -Estimating material -Layout procedure -Wall bracing -Sheathing -Metal studs -Cut and install ceiling joists
FALL CCA Construction Technology Midterm Exam w_TEKS annotated | Unit 5: Roofing (4 weeks) Roof Framing:(2 weeks) -Demonstrate an understanding of the terms associated with roof framing -mansard, gambrel, gable, hip, single slope (shed roof) -Identify the methods used to calculate the length of a rafter -Identify the various types of trusses used in roof framing -Use a framing square, speed square and calculator in laying out a roof.
Roofing Process and Materials: (2 weeks) Identify different types of roof coverings: -Types of asphalt/composite shingles (3 tab, dimensional) -Metal, wood, composition, and natural slate roofs
Identify materials in roofing: -Starter Shingles -Drip Edge -Ridge Cap -Felt (15#, 30#, synthetic underlayment) -Roofing Nails -Different types of Roof ventilation -Rain diverters -Roofing cement
Roof Measuring: -To measure a roof in squares, calculate the total are in square feet (for each section) and divide by 100
Unit 6: Electrical Wiring (5 weeks)
-Students gain knowledge about residential wiring and codes used in the construction industry.
-Students know the basic concepts of currents. Electrical safety and tools used for common wiring.
-romex wire, lamp kits, insulated and industrial electrician tools, wood planks | Unit 7: Drywall (4 weeks) The student knows various types of gypsum drywall and their uses and the fastening devices and methods used to install them -What is gypsum -How is drywall made -Different Types of drywall -Cutting methods -Drywall installation methods -Flat joint vs butt joint -Types of mud -Types of knives -Taping and finishing -Drywall repair -Texture types -Texture a wall
Building Materials (3 weeks) -House Wrap -Window Types -Single hung, Double hung -Window parts label -Window installation -Sill pan -Proper sealing of an ext. window -Types of doors int & ext. -Door swings and labeling -Door installation -Install lockset and deadbolt
Stairs (2 weeks) -Identify stair types -label stair parts -interpret constr. drawings of stairs -Calculate rise and run -Layout stringers -Cut stringers -Build a small stair |
Required Project:
-Safety Poster -OSHA 10 -Concrete Bench or stepping stones -General Safety Exam -Hand and Power Tool Safety Exams -Miter Saw Safety Exam -Table Saw -Safety Exam
District CTE Safety Exams | Required Project:
-Start Subfloor and Wall Model Project Subfloor and Wall Module | Required Project:
-Continue adding to the subfloor and wall model project by adding rafters, roof deck, shingles.
-Electrify the wall with different options. Example: -pigtail to receptacle -receptacle to toggle switch -toggle switch to light fixture -light fixture to 3 way toggle switch | Required Project:
-Install drywall on the wall -Drywall finishing and repair -Build small stairs |
| Employability Skills | |||
Cycle 1: -Professionalism -Ethics 127.15(1)(A) 127.15(1)(E) 127.15(1)(F) 127.15(1)(G) 127.15(1)(H) 127.15(1)(I) 127.15(1)(K) 127.15(1)(L) 127.15(1)(M) | Cycle 2: -Teamwork -Problem Solving 127.15(1)(B) 127.15(1)(I) | Cycle 3: -Self Management Skill -Conflict Resolution -Leadership 127.15(1)(B) 127.15(1)(D) 127.15(1)(E) 127.15(1)(F) 127.15(1)(G) 127.15(1)(H) 127.15(1)(I) 127.15(1)(J) 127.15(1)(M) | Cycle 4: Communication Skills 127.15(1)(C) |